Backyard ADUs in Davis, designed and built by one team

Plans, permits and construction for detached ADUs in Davis, from an architect and a licensed general contractor.

Davis backyard ADU
4 ftMinimum setback for the City's pre-designed ADUs
3 sizesCity pre-designed plans: 300, 565 and 740 sq ft
Licensed GCRequired by the City before a building permit is issued
$0State impact fees on ADUs under 750 sq ft

How Davis's pre-designed ADU plans work

The City of Davis offers free pre-designed ADU plans in three sizes (300 sq ft studio, 565 sq ft one-bedroom, 740 sq ft two-bedroom) and three styles: Adobe, Agrarian and Mid-Mod.
The plans are already plan-checked, so review is quicker and plan check fees are reduced. They are treated as Type 1 ADUs, so lot coverage, floor area ratio and open space limits don't apply.
The City doesn't accept changes to its pre-designed plans, and they must meet the 4 ft minimum setback.
A California licensed general contractor is required before the building permit is issued.

Licensed and insured

An architect and a general contractor on one team.

CA Architect License C38161 and CA Contractors License #890185 (B, A, C36, C20, C10). We design, permit and build your ADU, so one team answers for the price and the schedule.

Meet the team

How an ADU gets built in Davis

01

Check your lot

We look at setbacks, utilities and where an ADU fits. The City may require a larger sewer lateral, a bigger main electrical panel or solar.

02

Choose a path

Use one of our five plans, configured and priced up front, or ask us about building one of the City's pre-designed plans.

03

Site plan and permit

We prepare the site plan and pull the building permit as your licensed general contractor.

04

Build

Construction takes about 6 months after the contract is signed.

ADU plans for Davis lots

ADU questions in Davis

Can I build an ADU in Davis?

Most single-family lots in Davis can add an ADU. State law allows a detached ADU of at least 800 sq ft with 4 ft side and rear setbacks. We confirm what fits your lot at a free site evaluation.

What are the City of Davis pre-designed ADU plans?

Free plans from the City in three sizes (300, 565 and 740 sq ft) and three styles. They review faster with reduced plan check fees, but they can't be changed.

Do I need a contractor for a Davis ADU?

Yes. The City requires a California licensed general contractor before it issues the building permit. A Mayberry ADU holds CA Contractors License #890185.

What utility upgrades might a Davis ADU need?

Depending on the site, the City may require a larger sewer lateral, a bigger main electrical panel or solar panels. We price these at the site evaluation.

How long does it take to build an ADU in Davis?

Our ADUs take about 6 months to build after the contract is signed, plus permit time.

More ADU questions